The seven sections of an inline inspection report
Inline reports differ from pre-shipment reports in one important way: there is no AQL sampling verdict, because the lot is not finished. The report's job is to show what is going wrong now, with enough evidence for the apparel factory to fix it while fixing is still cheap.
| Section | What it must contain |
|---|---|
| 1. Header | Buyer, apparel factory, PO and style number, colour and size breakdown, order quantity, inspection date, inspector name. |
| 2. Production status | Quantity cut, sewn, finished and packed at the time of the visit, so the buyer can judge whether the order will land on the delivery date. |
| 3. Checklist result | Each garment checklist item with pass, fail or N/A — workmanship, labelling, packing and carton checks. |
| 4. Defects | Every discrepancy with its defect code, location on the garment, quantity affected and at least one photograph. |
| 5. Measurements | Findings against the measurement spec for the style, with tolerance and the out-of-tolerance points called out. |
| 6. Summary and verdict | A written assessment of the risk to the order, plus any corrective action requested from the apparel factory. |
| 7. Signatures | Inspector signature and the factory representative's acknowledgement, both timestamped. |